1 | | Public Participation |
2 | | Possible regulation changes in 3 AAC 52 addressing subscriber directories (Patch) |
3 | | In the Matter of the Evaluation of the Operation and Regulation of the Alaska Railbelt Electric Transmission System (Pickett) |
4 | | Other Business |
5 | | Executive Session as Required |