Public Notice P-13-005 (PTEP/BPTA):
Application for Connection -


NOTICE OF JOINT APPLICATION FOR CONNECTION PERMIT AND APPROVAL OF CONNECTION AGREEMENT

 

The REGULATORY COMMISSION OF ALASKA (Commission) hereby gives notice that PTE Pipeline LLC (PTEP LLC) and BP Transportation (Alaska) Inc. (BPTA) filed a joint application for a permit to connect the Point Thomson Export Pipeline to the Badami Pipeline System, on March 28, 2013. PTEP LLC and BPTA also request approval of the Connection Agreement related to the design, installation, maintenance, operation, removal and costs of certain facilities to be constructed or modified at or near the point of connection. The Point Thomson Export Pipeline, now under construction, will transport oil approximately 22 miles from the Point Thomson Central Pad to the existing Badami Sales Oil Pipeline at the Badami Central Facilities Pad, and on through the Trans Alaska Pipeline System to market. Docket No. P-13-005 was opened to address this matter.

P-13-005 Public Notice
Date Issued: 4/3/2013