Regulatory Commission of Alaska Files Report.
On January 21, 2014, the RCA filed a summary of its efforts to reduce the time required to
conclude proceedings that change a utility’s revenue requirement or rate design. The summary
follows the proposal the RCA delivered to the Alaska State Legislature on January 17, 2012. A
link to the RCA summary is below.
Report to the Legislature - A Summary of Efforts by the RCA to Reduce the Time Required to Conclude Proceedings
Date Issued: 1/21/2014