Public Notice TA440-18 MEA:
Annual CAP Revisions and Cost per Foot for New Construction -
Notice of Utility Tariff Filing
The REGULATORY COMMISSION OF ALASKA (Commission) gives notice that MATANUSKA
ELECTRIC ASSOCIATION, INC. (MEA), an electric utility, has filed tariff revision TA440-18, the
annual update to its CAP allowance and cost per foot for new construction. With TA440-18, MEA proposes to increase the cost per foot for constructing new single phase services
from $23.23 to $23.59 per foot. MEA proposes no change to the CAP allowance for the
2014 construction season, which remains at $4,500.
TA440-18 Public Notice
Date Issued: 3/17/2014