Public Notice TA371-8 Chugach Electric:
Revised distribution service fee -
NOTICE OF UTILITY TARIFF FILING
The REGULATORY COMMISSION OF ALASKA (Commission) gives notice that CHUGACH
ELECTRIC ASSOCIATION, INC. (Chugach) has filed TA371-8, to revise its distribution
service fee schedule for (1) raising or lowering facilities, and (2) special service
installations. On average, the fees are increasing by approximately 1% to account for
increased costs associated with providing these services, with the exception of the Joint
Use Trench, Single, Two-Party and Three-Party Installation requiring Temporary Corflo
Placement fee, which Chugach proposes to reduce each from the current price by
$0.10/ft.
TA371-8 Notice 042313
Date Issued: 4/23/2013